Project Detail

Title : Construction of road approaches to rail cum road bridge across river Ganga at Munger Ghat Near Munger, Bihar  

Associated Client : NHAI  

Location : Bihar  

Salient Features :

Total Length  :  9.516 Km Munger side + 5.257 Km Khagaria side
Munger side structures   :  24 viaducts, 11 VUPs & 2 culverts
Khagaria side structures : 19 viaducts, 1 VUP & 3 culverts
Foundation :          5.5m dia 20m deep Wells & 1.2m dia 27m deep Pile
Superstructure :       PSC I-Girder type superstructure
Carriageway width : 10.50 m
Approach Roads :    13.40 Km

Back