Project Detail

 

Title : 1.056 Km long Bridge project on river Fulahar at Nakatti Point in West Bengal.
 
Associated Client : P. W. D (Roads),Government of West Bengal
 
Location : West Bengal
 
Project Description :Salient Features:

 
Main Bridge  Length = 816 m
Foundation Type – Well Foundation
Super Structure – Cast-in-Situ PSC I-Girder
Carriageway – 10.5 m – 2 Lanes
 
Viaduct  (2 Nos – 120 Rm each )
Foundation Type – Pile Foundation
Super Structure – Cast-in-Situ RCC Deck Slab
Carriageway – 10.5 m – 2 Lanee
 
Approaches 1920m

Back